Challenge
Subcontract Challan Leakage & Manual Document Delays
With 12 separate garment factories manufacturing for leading European and US brands, the group suffered from blind spots between cutting, embroidery, washing, and packing floors. Subcontract challans were tracked on paper with frequent discrepancies, piece-rate payroll took 30 accountants five full days, and buyer compliance audit scores hovered around 72%.
⚠️ Unreconciled subcontract washing and embroidery challans causing an estimated $180,000 annual loss.
⚠️ Manual commercial export documentation requiring 3.5 hours per container shipment.
⚠️ Complex piece-rate wage calculation tying up 30 administrative staff for 5 consecutive days.
⚠️ International fashion buyer compliance audit scores stalled at 72% due to scattered records.
The Simal Solution
UniERP Enterprise Manufacturing & Automated Compliance
UniSoft (Simal Technologies Software Division) deployed the complete UniERP Enterprise Manufacturing Suite, linking cutting, sewing, piece-rate barcode tracking, subcontract verification, commercial export invoicing, and biometric payroll across all 12 facilities.
01
Real-time Barcode Piece-Rate tracking on sewing lines connected directly to payroll.
02
Automated Subcontract Challan reconciliation module with GPS tracking and weigh-scale sync.
03
Single-click Commercial Export Documentation generator compliant with EU & US Customs.
04
Centralized HR & Biometric Attendance engine processing 35,000 worker wages in 4 hours.
Delivery Lifecycle
Implementation Timeline & Methodology
⏱️ Project Duration: 16 Weeks Phased Group Rollout — 3-stage deployment ensuring factory floor operations never stopped for a single hour during migration.
Weeks 1-8
Phase 1: Merchandising, BOM, Inventory, and Production floor barcode rollout.
Weeks 9-12
Phase 2: Subcontract Challan gate control and Commercial Export Documentation.
Weeks 13-16
Phase 3: Biometric piece-rate payroll, compliance dashboards, and group go-live.
Business Impact
Dramatic Operational Transformation in 12 Months
| Key Performance Indicator | Before Simal | After Go-Live | Measured Impact |
| Subcontract Challan Leakage | $180K/year | $0 Leakage | 100% Elimination |
| Monthly Payroll Processing | 5 Days (30 staff) | 4 Hours (2 staff) | 90% Efficiency |
| Export Docs per Shipment | 3.5 Hours | 18 Minutes | 11× Faster Export |
| Order-to-Shipment Cycle | 72 Days | 58 Days | 14 Days Saved (-19%) |
| Brand Compliance Score | 72.0% Average | 91.0% Certified | +19% Improvement |
The system paid for itself within 7 months through subcontract leakage elimination alone, while elevating the group into preferred supplier status with major European retail brands.
“
UniERP gave us visibility into every subcontract challan and production bundle in real time. That single capability saved us $180,000 in the first year. Furthermore, processing 35,000 payroll records in four hours transformed our administrative morale.